
Altona Transfer Station
The Altona site has a semi-automatic separation system to process construction waste from projects that demand that waste created must be processed and segregated to the highest possible level.
There is also a facility to process normal industrial and demolition waste which is manually separated for timber, cardboard and metals. All remaining waste is transferred to the Bacchus Marsh landfill.
MATERIALS ACCEPTED
Construction waste disposal
Furniture items and timber disposal
Green waste disposal Melbourne
Cardboard recycling
Metal recycling in Melbourne
Plasterboards and plastics disposal
Textile waste disposal
MATERIALS NOT ACCEPTED
Chemicals and Solvents
Asbestos
Bio Waste
6.30am - 4.30pm Mon-Fri 7.30am - 12.00pm Sat
20 - 30 Baldwin Road, Altona North. Phone: 9369 6222